1240 Liquid Cooling Container with UPS (L1240C45) L1240C45SUR150 45 ft · single loop · up to 150 kW/rack

The one you buy when
the site has nothing yet.

L1240C45 is the empty-pad liquid block: 1,240 kW, nine racks, UPS + battery inside the 45 ft box. You connect utility, water, and network — not a distribution project. Expansion blocks: 90 days ex-works.

Runs CIOS · →
1240 kW
IT Capacity
up to 150 kW/rack
Power Density · R150
26 °C TCS
Warm-Water Loop
90 d EXW
From down payment
01
What L1240C45 is

One container. Nine racks. One warm-water loop.

L1240C45 is the empty-pad liquid block: a 45-ft High Cube holding 8× 150 kW liquid-cooled racks plus one 40 kW air-cooled rack on a single 26 °C warm-water loop. Everything is integrated, tested, and sealed at the factory — on site you connect power, water, and network.

Form Factor
45-ft High Cube container
SKU ID
L1240C45SUR150
IT Capacity
1,240 kW · 8× liquid-cooled + 1× air-cooled rack
GPU Platform
GB300 NVL72 · B300 HGX (SXM / NVLink)
Cooling
Cold plate + rear-door HX + ceiling units · single loop
UPS
UPS + battery integrated inside the container
Density
Up to 150 kW/rack (R150)
PUE
≈ 1.15–1.20 typical mid-climate only — not free-cooling or summer-peak; confirm in TCO / Designer
Lead Time
90 d EXW from down payment · expansion 90 d EXW

Roadmap A separate MDCX power module (UPS / battery / PDC) is in development for sites where the boundary must sit outside the compute enclosure.

IT Load vs. Facility Load. 1240 kW is what the servers draw. Total facility load is higher once cooling and auxiliaries are added — the gap is set by PUE, which depends on your site's climate. Confirm the operating point in TCO or Liquid Cooling Designer; do not treat 1.15–1.20 as an unconditional rating. Always confirm which figure an "X MW" requirement refers to.

Cutaway view of the L1240C45 liquid cooling container
L1240C45 cutaway — 8× 150 kW DLC racks + 1× 40 kW air-cooled rack on a single 26 °C warm-water loop.
02
Versus the rest of the line

The only liquid SKU that brings UPS inside the box.

You land 1,240 kW, eight 150 kW liquid racks plus one 40 kW air rack, a single 26 °C loop, and UPS + battery already in the enclosure. L1800 is the 220 kW/rack twin that leaves power outside. L450 is the 20 ft first placement at a higher cost per kW.

Cold plate is the entry ticket for SXM-class density. Why Liquid Cooling →

03
Walk through it

Explore L1240C45 in 3D

Orbit the cutaway — rack rows, CDU, warm-water piping, and the air-cooled rack — before you visit a factory.

MDCX L1240C45 liquid cooling container cutaway
2× L1240C45 twin Gemini layout · reference

Side-by-side twin containers with interconnect fire door — 2× 1,240 kW IT reference layout.

MDCX L1240C45 Gemini twin liquid cooling containers

The OpenUSD reference model is published in the annex of the L1240C45 Reference Design. Heavy USD is explicit download only. Specs: USD output.

Ready to specify a block?
Talk to sales, or model economics in TCO first.

Single-line power, cooling loops, ratings, and downloads for engineers.

Questions

Does L1240C45 include a UPS?

Yes. L1240C45 (L1240C45SUR150) integrates UPS and battery inside the 45 ft container. On site you connect utility, water, and network.

How many racks does L1240C45 hold?

L1240C45 holds eight 150 kW liquid-cooled racks plus one 40 kW air-cooled rack, for 1,240 kW IT.

What PUE does L1240C45 reach?

Liquid Cooling PUE is about 1.15–1.20 in typical mid-climate only — not an unconditional product rating. Free-cooling and summer-peak operating points fall outside this band. Confirm the site point in TCO or Liquid Cooling Designer.

How long is delivery for L1240C45?

First delivery is 90 days ex-works from receipt of down payment, up to 120 days if the line is full. On-site commissioning is 3–4 weeks. Freight is buyer-arranged.