Talk to sales → TCO Analysis →
Product · Immersion Cooling
400 Immersion Cooling Container with UPS (I400C45) I400C45SUT50 Immersion Cooling containers · 400 kW · up to 50 kW/tank · I400C45 includes UPS

Lowest cost per GPU,
with power included.

I400C45 is the complete inference pack: eight A32 tanks, 400 kW, UPS + battery in the same 45 ft box. Up to 512 PCIe GPUs, PUE ≈ 1.05 where peak dry-bulb ≤ 24 °C (free-cooling; not hot-zone). You land compute and power together. Expansion blocks: 90 days ex-works.

Runs CIOS · →
400 kW
IT Capacity
512 GPUs
PCIe · Max per Container
ΔT 8 K
Immersion Oil Loop
PUE ≈ 1.05
≤ 24 °C dry-bulb / free-cooling
01
What I400C45 is

Eight tanks plus UPS in one 45 ft box.

I400C45 is the published 400 kW immersion pack with power in the enclosure. 8× A32 tanks plus one 10 kW air rack, each tank to 50 kW with dual 2N CDUs, heat out on a 32/37 °C warm-water loop, EATON UPS and battery in the dedicated 45 ft power bay. On site you connect utility, water, and network — not a second power project.

SKU ID
I400C45SUT50 (I400C45)
Form Factor
45 ft container with dedicated power bay
IT Capacity
400 kW · 8× A32 tanks + 1× 10 kW air rack
GPU Platform
4090 · 5090 · RTX PRO 6000 Blackwell SE · H100 · H200 (PCIe, 4U 8-GPU)
Cooling
Single-phase immersion · dual 2N CDU per tank
UPS
UPS + battery integrated inside the container
Density
Up to 50 kW/tank (T50)
PUE
≈ 1.05 · peak dry-bulb ≤ 24 °C — not hot-zone
Lead Time
90 d EXW from down payment · expansion 90 d EXW

Roadmap A separate MDCX power module (UPS / battery / PDC) is in development for sites where the boundary must sit outside the compute enclosure.

IT Load vs. Facility Load. 400 kW is what the servers draw. Total facility load is ~440–500 kW once cooling and auxiliaries are added — the gap is set by PUE, which depends on your site's climate. Sites whose historical peak dry-bulb stays ≤ 24 °C run on pure dry coolers (free cooling); hotter sites add a hybrid chiller and are not 1.05. Always confirm which figure an "X MW" requirement refers to.

I400C40 container floor plan: 8 immersion tanks, service aisle, power and cooling distribution
I400C45 floor plan — 8 immersion tanks, service aisle, and the 45 ft power bay that holds UPS + battery.
02
The one thing

Eight tanks plus UPS in the box — the complete inference pack.

Pick I400C45 when the pad has no UPS of its own and lithium in the enclosure is allowed. You are buying one SKU instead of a compute box plus a yard power project. I400C40 is the twin that drops the power bay and five feet. I200C20 is the 20 ft, four-tank edge bay.

Immersion is the lowest-OpEx path to PCIe density. Why Immersion Cooling →

03
Walk through it

Explore the I400C45 container in 3D

The 45 ft cutaway includes the power bay. Orbit the eight tanks, then the UPS/battery volume that I400C40 leaves in the yard.

MDCX I400C45 immersion cooling container cutaway with tank rows

The OpenUSD reference model is published in the annex of the I400C45 Reference Design. Heavy USD is explicit download only. Specs: USD output.

04
Pick your container

Same 400 kW core. Two power architectures.

Both containers share the identical immersion core — 8× A32 tanks, the same oil loop, the same cooling rules. They differ in where the UPS lives.

I400C40 I400C45
Container 40-ft 45-ft (adds a dedicated power bay)
IT Capacity 360 kW rec. / 400 kW max 400 kW
UPS (600 kW) External — customer-supplied Built-in power bay
Battery Backup ~10 min (customer-supplied) ~20 min (built-in)
UL Compliance UL compliant
Best For Lowest cost & size; sites with existing UPS Turnkey & regulated markets
Ready to specify a block?
Talk to sales, or model economics in TCO first.

Single-line power, cooling loops, ratings, and downloads for engineers.

Questions

How many GPUs fit in I400C45?

Up to 512 PCIe GPUs per I400C45 container (I400C45SUT50), across eight A32 tanks at up to 50 kW/tank.

What PUE does immersion cooling reach?

About 1.05 in free-cooling climates (historical peak dry-bulb ≤ 24 °C). Hotter sites add a hybrid chiller for peaks and are not 1.05.

Does I400C45 include a UPS?

Yes. UPS and battery sit in the dedicated 45 ft power bay. That is the complete inference pack.

How long is delivery for I400C45?

First delivery is 90 days ex-works from receipt of down payment. Expansion blocks: 90 days ex-works.

Specifications updated August 2026 · design targets, site conditions apply.